Regulation (EU) 2023/1115 · EU Deforestation Regulation

Your buyer needs a deforestation due diligence statement. Get one ready for TRACES in an afternoon.

plotvera is self-serve EUDR compliance software: it validates your coffee, cocoa, timber, rubber, soy or palm plots, screens them for deforestation, and prepares a TRACES-ready due diligence statement for the EUDR Information System. First 3 screenings free, no consultant, no sales call.

Screen a plot free

First 3 screenings free. No credit card. No sales call.

See your own plot, not a sales demo.

Plot dossier LOT 2026-0143 · coffee
4.653917, -74.0817494.653512,-74.0825613.62 hapolygon · WGS84 · 6 dpEPSG:4326cutoff 2020-12-31
  • geometry · self-intersectionpass
  • tree-cover loss after 2020none detected
  • TMF degradation 2021-2026none detected
  • RADD / GLAD alerts0 in plot
Low risk ready to file → TRACES

Procedure

Four steps from your orders to a reference number

01 → 04 · keep scrolling

  1. 01 Collect · step 1 of 4

    Import your orders, collect the plots

    Start from what you buy: paste or upload your purchase orders and plotvera flags the in-scope lines automatically. Then collect the plot behind each one: send the supplier a share link so they add their own, drop in GeoJSON, WKT or KML, or draw it on the map when all you have is a pin and a farmer on the phone.

    orders · in-scope lines · supplier links

  2. 02 Validate · step 2 of 4

    Geometry validated instantly

    WGS84 coordinates at six decimal places, polygons wherever the 4-hectare rule requires them. Self-intersections, duplicate vertices and inverted winding are caught on upload, not by a TRACES rejection three weeks before your shipment clears.

    wgs84 · 6 decimal places · 4 ha rule

  3. 03 Screen · step 3 of 4

    Screened against satellite evidence

    Every plot runs through convergence-of-evidence screening built on the open WHISP methodology: tree-cover, land-use and deforestation-alert datasets checked against the 31 December 2020 cutoff. Each plot gets a verdict with the triggering dataset named.

    whisp · cutoff 2020-12-31

  4. 04 File · step 4 of 4

    Doc pack generated, DDS TRACES-ready

    Your due-diligence procedure, risk assessment and supplier declarations are generated for the 5-year retention file, alongside a due diligence statement in the exact structure TRACES expects. You submit it in the official TRACES portal in minutes; the reference and verification numbers it returns go on your customs declaration. Direct API filing is in testing against the TRACES acceptance environment.

    doc pack · dds in the traces structure

The regulation

What the EU Deforestation Regulation requires

Regulation (EU) 2023/1115, the EU Deforestation Regulation, requires that in-scope commodities and the products made from them are deforestation-free, were produced in accordance with the legislation of the country of production, and are covered by a due diligence statement before they are placed on, or exported from, the EU market.

The essentials Reg. (EU) 2023/1115

In scope

Seven commodities

Cattle, cocoa, coffee, oil palm, rubber, soya and wood, plus the derived products listed in Annex I.

Cutoff date

31 December 2020

Nothing may come from land deforested or degraded after this date. It applies to everyone, whatever your size.

Application dates

30 December 2026

When most operators and traders must comply. Micro and small operators established by 31 December 2024 have until 30 June 2027; medium companies do not.

Penalties

4% of EU turnover

The maximum fine must reach at least 4% of Union-wide annual turnover, with confiscation of the goods and possible exclusion from public procurement.

What you must be able to file DDS · TRACES
  • ·A due diligence statement submitted through the EU Information System (TRACES) before the goods reach the market.
  • ·Plot geolocation behind every statement: a single point for a plot of 4 hectares or less, a polygon for anything larger.
  • ·Evidence that the commodity was produced in accordance with the laws of the country of production.
  • ·A documented risk assessment, with mitigation measures wherever the risk is more than negligible.

How we screen

You can name every dataset behind a verdict

Screening uses the convergence-of-evidence approach of WHISP, the open methodology from FAO's Forest Data Partnership, with indicators drawn from global forest-cover datasets including the EC JRC layers. No single dataset condemns a plot; agreement across independent sources does. Every check asks the same question the regulation asks: is there deforestation after 31 December 2020 inside this exact geometry?

When an authority asks why you concluded negligible risk, the answer is a table, not a shrug.

  • Low risk No dataset shows post-cutoff deforestation. Solid ground for a statement.
  • High risk At least one dataset shows loss after the cutoff, and we name it. A signal to act on, not a ban.
  • More info needed Sources disagree or the geometry is too coarse to judge. Fix the data before relying on it.
How country benchmarking changes your checks →
  • Tree cover & loss year

    Global Forest Change

  • Tropical moist forest transitions

    EC JRC TMF

  • Land cover baseline 2020

    ESA WorldCover

  • Near-real-time alerts

    RADD · GLAD

  • Commodity & plantation layers

    crop-specific datasets

  • Protected areas & concessions

    national layers where published

EU-hostedGDPRData exportable anytime

Nothing proprietary holds your data: geometries are plain GeoJSON, documents are files you download and keep for the 5-year retention duty.

Pricing

Priced for operators, not procurement departments

Both plans start the same way: screen your first 3 plots free, no card, and look at real verdicts before you decide anything.

Enterprise EUDR suites typically start in the five figures per year, behind a sales call. We publish our prices.

Pay as you go

No subscription

€25 / due diligence statement

Best for occasional filers and trying plotvera out

  • ·Geometry validation for every plot in the consignment
  • ·Satellite screening with per-plot verdicts
  • ·Generated due-diligence doc pack for your 5-year file
  • ·DDS generated in the exact TRACES structure, ready to submit
Start with 3 free screenings

Unlimited

Filing season

€99 / month

Best for regular importers and filing season

  • ·Unlimited plot screening and DDS generation
  • ·All seven commodities, one workspace
  • ·Supplier share links for plot collection
  • ·Evidence archive structured for the 5-year retention duty
  • ·Cancel anytime, you keep your documents
Start free, upgrade when filing

Prices exclude VAT. One DDS can cover many plots. Most SME consignments fit a single statement.

Straight comparison

plotvera vs enterprise EUDR suites

Built for importers, not compliance departments. Enterprise EUDR suites want a sales call and a five-figure contract; plotvera gives EU SMEs plot screening and DDS preparation at €25 per statement.

Disclosure: we build plotvera. The table below marks us down honestly where the suites are genuinely better, so the green cells mean something.

  • Self-serve signup

    plotvera Yes: Sign up and screen your first plot today
    Enterprise suites No: Demo call first, then onboarding
  • Public pricing

    plotvera Yes: €25 per DDS or €99 per month, on this page
    Enterprise suites No: Price on request; typically five-figure annual contracts
  • Time to first screening

    plotvera Yes: Minutes; first 3 screenings free
    Enterprise suites Partial: Days to weeks, after the sales cycle
  • Satellite deforestation screening

    plotvera Yes: WHISP-aligned open datasets, per-plot verdict
    Enterprise suites Yes: Yes, often with proprietary analytics on top
  • DDS generation

    plotvera Yes: Full doc pack plus a DDS in the TRACES structure
    Enterprise suites Yes: Yes
  • TRACES API filing

    plotvera Partial: In testing against the official acceptance environment; not switched on yet
    Enterprise suites Yes: Live in several suites
  • N-tier supplier risk monitoring

    plotvera Partial: Supplier tiers plus continuous monitoring of your declared plots, with alerts on new deforestation or verdict changes; no auto-discovery of unmapped upstream suppliers
    Enterprise suites Yes: A genuine strength: continuous monitoring across supplier tiers
  • Supplier management portal

    plotvera Partial: Share links for plot collection only
    Enterprise suites Yes: Questionnaires, legality documents, audits, scoring
  • Minimum contract

    plotvera Yes: None; monthly, cancel anytime, keep your documents
    Enterprise suites No: Typically annual commitments

If you manage thousands of suppliers across tiers, buy one of the suites. If you need your own plots screened and a defensible statement ready for TRACES this quarter, that is exactly what we sell.

Before you buy anything

Find your gaps while they are still cheap

Most EUDR failures are boring: a supplier list without coordinates, points where polygons are required, no TRACES access, nobody owning the 5-year file. The checklist walks all of it in one page.

Free EUDR gap-analysis checklist

One printable page. 24 checks across scope, supplier data, geometry, risk and filing readiness. Find out what you are missing before an authority does.

No drip campaign. One email with the link, nothing else.

Questions

Asked before every first filing

Am I even in scope? +

If your company places cattle, cocoa, coffee, palm oil, rubber, soy or wood products, or goods derived from them, such as chocolate, leather, tyres, furniture or paper, on the EU market, or exports them from it, you are in scope of Regulation (EU) 2023/1115. Operators file due diligence statements; traders keep records of the statements upstream. Size changes your deadline and some obligations, not whether you are in scope. The free checklist on this page walks the question in detail.

Which deadline applies to my company? +

Large and medium operators must comply from 30 December 2026. Micro and small enterprises, as defined in the EU Accounting Directive 2013/34/EU by balance sheet, turnover and headcount, get until 30 June 2027. If you are near a threshold, check the definition properly: the difference is six months of runway.

What is a due diligence statement (DDS)? +

A structured declaration filed in the EU TRACES system before goods are placed on the market: who you are, the product and HS code, quantities, country of production, and the geolocation of every plot the goods come from, plus your confirmation that due diligence found no more than negligible risk. TRACES returns a reference number and verification number, which are quoted in the customs declaration.

My supplier only sent a pin, not a polygon. Is that enough? +

Plots of 4 hectares or less can be declared with a single point (six decimal places, WGS84). Anything larger needs a polygon. Cattle is the exception: you geolocate the establishments where the animals were kept, not crop plots. plotvera validates this rule on upload and tells you which plots still need polygons.

Do you actually submit to TRACES, or just generate a file? +

Today plotvera generates your due diligence statement in the exact structure TRACES expects, together with the validated geolocation data, so submitting it in the official TRACES portal takes minutes; TRACES then returns the reference and verification numbers you quote at customs. Direct API submission is built and in testing against the official TRACES acceptance environment. We will switch it on when it is verified end to end, and we will not advertise it a day earlier.

What does the deforestation screening actually check? +

Each plot is compared against multiple independent satellite datasets, covering tree cover and loss year, tropical moist forest transitions, 2020 land-cover baselines, and near-real-time deforestation alerts, using the convergence-of-evidence approach of the open WHISP methodology. The question is always the same: is there evidence of deforestation after 31 December 2020 inside this geometry?

What happens when a plot flags high risk or more info needed? +

You see which plot, which dataset and which years triggered the verdict. High risk is not a ban: you can request better geometry from the supplier, gather counter-evidence, or exclude the plot from the consignment. More info needed usually means the sources disagree or the geometry is too coarse to judge. plotvera will not generate a DDS over a red plot: a statement you cannot defend is worse than a late one.

What are the penalties for getting EUDR wrong? +

Member states set the exact sanctions, but the regulation requires that maximum fines reach at least 4% of a company’s EU-wide annual turnover, and provides for confiscation of the products and the revenues from them, plus temporary exclusion from public procurement and public funding. Non-compliant consignments can be refused at the border. That is the factual downside, stated once; the practical answer is a defensible due diligence file.

Is €25 per DDS all-in? +

Yes. One statement includes geometry validation for every plot in the consignment, satellite screening with per-plot verdicts, the generated due-diligence doc pack, and the DDS itself in TRACES-ready form. One DDS can cover many plots, and most SME consignments fit a single statement. Prices exclude VAT. If you file often, €99 per month makes screening and DDS generation unlimited. Your first 3 screenings are free either way, no card.

What happens to my data if plotvera shuts down? +

You can take your data out at any time: plot geometries are stored as plain GeoJSON and every generated document downloads as a normal file, so nothing is locked in a proprietary format. EUDR requires you to keep due diligence records for 5 years, so whichever vendor you use, keep a local copy of each statement’s pack; plotvera makes that a download, not a support ticket. Hosting is in the EU and processing is GDPR-compliant.

Is plotvera legal advice? +

No. plotvera handles the data mechanics of compliance: geometry validation, satellite screening, document generation and DDS preparation. Interpretation of the regulation for your specific situation belongs with your counsel; our guides cite the source rules so you can verify everything.

Reference

Guides for your commodity

All guides →

16 weeks to 30 December 2026

Filing takes an afternoon. Getting the plot data from your suppliers takes months. Start now.

First 3 screenings free. No credit card. No sales call.